You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Pesanggrahan Mulai Dikerjakan

Pesanggrahan River Dredging Starts

The dredging of Pesanggrahan river or precisely beside Tanah Kusir cemetery, Kebayoran Lama is started by Water Body UPK, Jakarta Dept. of Cleanliness. One amphibious excavator is deployed.

Trash and mud are dredged from the river

“Trash and mud are dredged from the river,” said Irwan Herdiana, agency’s supervisor, Friday (9/16).

The dredging is run from Kampung Poncol Pesanggrahan up to Ulujami bridge, Cipulir. His side hopes the project will decrease the inundation at Cipulir.

Heavy Equipment Deployed to Pesanggrahan River

“River depth is vary from 1.5 meters to 2 meters. We’ll deep the river up to four meters,” he added.

The dredging was postponed since the heavy equipment must pass the private land. His side needs permit from the owner.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1059 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye994 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye928 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye707 personAldi Geri Lumban Tobing