You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Pesanggrahan Mulai Dikerjakan

Pesanggrahan River Dredging Starts

The dredging of Pesanggrahan river or precisely beside Tanah Kusir cemetery, Kebayoran Lama is started by Water Body UPK, Jakarta Dept. of Cleanliness. One amphibious excavator is deployed.

Trash and mud are dredged from the river

“Trash and mud are dredged from the river,” said Irwan Herdiana, agency’s supervisor, Friday (9/16).

The dredging is run from Kampung Poncol Pesanggrahan up to Ulujami bridge, Cipulir. His side hopes the project will decrease the inundation at Cipulir.

Heavy Equipment Deployed to Pesanggrahan River

“River depth is vary from 1.5 meters to 2 meters. We’ll deep the river up to four meters,” he added.

The dredging was postponed since the heavy equipment must pass the private land. His side needs permit from the owner.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1088 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye571 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye489 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye473 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye470 personBudhi Firmansyah Surapati